Running large AI models requires enough power that technology companies are running into local utility limits. Rather than waiting for utility upgrades, operators are adopting the Bring Your Own Power (BYOP) model, installing generation assets directly on site. A case study from the Better Data Center Project reviews Anthropic's power contracts and shows how the company's planned expansion relies almost entirely on fossil fuel infrastructure.
The BYOP Shift: 177 GW of Planned Gas
To avoid interconnection queues, developers are building dedicated generation behind the utility meter. Analysts tracked 177 GW of planned BYOP natural gas capacity across the United States, roughly equal to the electricity consumed by 65% of American households. Utilities are also planning another 200 GW of fossil generation on the main grid to absorb coming data center loads.
Renewable sources make up less than 20% of planned BYOP capacity through 2032, constrained by the need for continuous baseload power and supply chain backlogs.
Anthropic's Projected 2028 Power Mix
Anthropic has contracted roughly 15 GW of compute capacity, with 5.9 to 9.6 GW assigned to specific facilities. Modeling on-site gas installations and marginal grid generators through the EPA's AVERT dispatch tool yields this projected breakdown for Anthropic's power supply in 2028:
- Natural Gas: ~87%
- Coal: ~11%
- Renewables: Negligible direct allocation in the US
The dispatch profile estimates the short-run marginal generation required to support this load:
{
"model": "EPA AVERT Dispatch",
"workload": "Anthropic US Data Centers",
"projected_year": 2028,
"power_breakdown": {
"gas_generation_pct": 87,
"coal_generation_pct": 11,
"carbon_intensity": "1033-1076 lb CO2e/MWh"
},
"national_grid_avg": "767 lb CO2e/MWh"
}Emissions and Turbine Choices
Annual greenhouse gas emissions from Anthropic's contracted data centers could reach between 17 and 38 million MtCO2e annually by 2028, with a central estimate of 32 million MtCO2e. That total exceeds the entire annual in-state power generation emissions of California and is higher than the projected 2025 combined Scope 2 emissions of Meta, Microsoft, and Google.
The choice of generating hardware contributes directly to those figures. Roughly 80% of Anthropic's on-site gas capacity relies on simple cycle gas turbines and reciprocating internal combustion engines rather than combined-cycle plants. These units are faster to install, but they burn more fuel per megawatt-hour and produce higher levels of nitrogen oxides (NOx) and fine particulate matter (PM2.5).
Company Targets and Site Reality
Anthropic states publicly that it requires strict air permits and Selective Catalytic Reduction (SCR) filters for its data centers. Site operations show exceptions: at SpaceX's Colossus 2 facility, where Anthropic leases hundreds of megawatts of compute, operations have used temporary gas turbines without SCR systems while working through permit reviews.
As power demand for AI compute increases, the need for immediate megawatts continues to outpace the clean energy supply available to support it.